Know what it takes to make the order.
A bill of materials lists the inputs and quantities needed to make a product. Use it to plan the materials for a run and record what production consumes.
One gift set. Three components.
Each set needs one candle, one box and one sleeve. Increase the run to see what the team needs to have ready.
One gift set
100 gift sets
Count the output
Record the finished quantity and investigate any difference from the plan.
Start with the materials and the yield.
List each component, its unit and the quantity needed for the output. A run of 100 sets calls for 100 of each component. If a case holds several units, agree which unit the recipe uses before counting what is available.
Check the constraint before promising the run.
If you have 100 candles and sleeves but only 80 boxes, you have enough materials for 80 complete sets. Check inbound deliveries and reservations as well as the physical count. If actual yield differs from the plan, record the difference rather than assuming every set was completed.
How Fulfil uses the bill of materials
Fulfil uses BOM inputs and output quantities to calculate material requirements for a production order. A BOM can include sub-assemblies and multiple outputs. Production records the materials consumed and the finished goods produced.