Implementation Pricing Docs
Made to order Fulfil, the ERP for Shopify brands

Sell what your makers can build, and make what you have sold.

When a made-to-order product is ordered on Shopify, Fulfil creates the production order, shows the maker the personalization and holds the shipment until the piece is done.

The problem

Without one system, a custom order is typed again at each step.

These are brands describing the time before Fulfil.

Each custom order read by a person

“say we ran a sale over a weekend and we would get, I don’t know, let’s just say 5,000 orders for an easy number. Those all had to be manually gone through.”
Alex Ledoux, Co-Founder, Karta Ventures (Sola Wood Flowers)

Production records nobody trusts

“It worked fine for a small scale, but didn’t have as much traceability. People were able to manipulate things. The data integrity just wasn’t there.”
Peter Kephart, Director of Operations, Hello Adorn

Weeks from the order to the shipment

“Pre-Fulfil, we were potentially two weeks lead time on a direct consumer order. We just had no visibility in QuickBooks.”
Ori Adler, Director of Operations, American Hat Makers

The order, the production order and the shipment are one record.

The customer’s words arrive with the Shopify order and stay on the line. The production order is made from that line, and the shipment waits for it.

A personalized order SO-20418 · 14 units of TWL-204, embroidered
SoldOn Shopify
ShopifyFaireWholesale
SO-20418
EmbroideryJMW
StrategyMake to Order
MadeProduction order
MO-0931
EmbroideryJMW
Made14
The shipment waits14 of 14 made
ShippedAnd invoiced
Workshop14
Total$4,280.00
In the ledger, on the same record
14
units sold
14
units shipped
14
units invoiced
1 record0 orders typed again0 exports
SO-20418 · line 1TWL-204
EmbroideryJMW
ThreadNavy
From the Shopify line itemOn the production order
Personalization

Nobody types the engraving again.

Shopify line item properties import with the order and map to product options. They print on the production order, the pick list and the packing slip.

TWL-204Bill of materials
Blank towel62
Gift box47
You can build47
Materials

Know how many you can make before you promise them.

A bill of materials lists the components of each product. Fulfil shows how many units the materials on hand can build, and which component sets the limit.

SO-20418Has embroidery
1WorkshopMakes and ships14
2East 3PLStock items only
Rule: embroidery is set1 shipment
Routing

Custom orders go to your workshop, and the rest ship from stock.

A routing rule can read the product options. An order with an engraving goes to the warehouse that makes it, and an order with none goes to your 3PL.

Brands that make to order on Fulfil.

Peter Kephart of Hello Adorn on a video call Peter KephartDirector of Operations, Hello Adorn
“It just inherently did that because now we’re making what we’re actually selling, and we’re not building things that we’re going to sit on for a long period of time.”
Joseph Zeuner of Jennifer Zeuner Jewelry on a video call Joseph ZeunerEcommerce and Operations, Jennifer Zeuner Jewelry
“With all of the automations that we put in place and just the streamlining, we were able to take the production time down significantly. I think it was over 30% that we shortened the production time for the personalized jewelry.”
Alex Ledoux of Karta Ventures, the owner of Sola Wood Flowers Alex LedouxCo-Founder, Karta Ventures
“I think what separated Fulfil was the fact that it’s like the ERP side is very strong, but it has equally as strong like a production module”

Results at these and other brands

Works with Claude and the assistants you already use.

  • Claude
  • ChatGPT
  • Grok
  • OpenClaw
  • Your own agents

An assistant reads the same orders, production orders and inventory as your team, with the permissions you set.

Example

Which personalized orders are late, and what is holding them?

9 orders are past their ship date, and 7 of them wait for one material. The 7 need navy thread, which ran out on Tuesday. PO-3107 brings 40 spools tomorrow. The other 2 are made and wait for a second line that ships from stock. Make the 7 first when the thread arrives, and all 9 can ship by Thursday.

Answered from the same records that your team uses

On the shelf on the books.