Implementation Pricing Docs
EDI DocumentPart of EDI in Fulfil, the ERP for Shopify brands

CONTRL Syntax and Service Report. It tells the retailer that its interchange arrived.

After Fulfil receives an EDIFACT ORDERS and creates the sales order, it sends a CONTRL back to the retailer. It is the EDIFACT counterpart of the X12 997.

CONTRL Syntax and Service Report (EDIFACT)You to retailer
  • UNH+0001+CONTRL:D:3:UN:EAN004Opens the CONTRL message
  • UCI+100042+RETAILERID:14+YOURID:ZZZ+8Interchange 100042, its sender and its receiver. 8 means received
  • UNT+3+0001Closes the message: three segments in all

Why CONTRL matters.

Without it, the retailer cannot tell that its order arrived

An interchange with no CONTRL looks lost, and the retailer may send the order again or call to ask about it.

A retailer may require it

Its EDI guide can list the CONTRL among the messages you have to return. Fulfil sends it for each trading partner that has it configured.

It is not the answer to the order

The CONTRL covers delivery of the interchange. The retailer learns what you will ship from the ORDRSP.

Where the CONTRL sits You to retailer
FulfilCreates the sales order from an ORDERS
Interchange100042
Sales orderSO-20418
CONTRLQueued
CONTRLSyntax and Service Report (EDIFACT)
1ORDERS Purchase Order (EDIFACT)Retailer to you
2CONTRL Syntax and Service Report (EDIFACT)You to retailer
3ORDRSP Order Response (EDIFACT)You to retailer
4DESADV Despatch Advice (EDIFACT)You to retailer
RetailerKnows its interchange arrived
Interchange100042
Action code8, received
Marked Accepted in Fulfil once it is sent

What's included in a CONTRL.

The CONTRL that Fulfil sends has one segment of content, the interchange response (UCI).

What it says

  • The control reference of the interchange it answers
  • The sender ID of that interchange, with its qualifier
  • The receiver ID of that interchange, with its qualifier
  • Action code 8: the interchange was received

What it leaves to other messages

  • Whether you accept the order (the ORDRSP)
  • The quantity and price you confirm for each line (the ORDRSP)
  • What shipped in each carton (the DESADV)
  • Errors in a single message or segment

How CONTRL works in Fulfil.

Fulfil creates the CONTRL for you. There is nothing to enter.

  1. 1An ORDERS interchange arrives

    Fulfil decodes each order in it and creates the sales orders.

  2. 2The ORDERS document is Accepted

    If the trading partner has an outbound CONTRL configured, Fulfil creates one for the interchange. A second order from the same interchange uses the same CONTRL.

  3. 3Fulfil encodes and sends it

    The scheduler writes the interchange response with the control reference and the two IDs taken from the inbound header, then transmits it.

  4. Accepted on transmission

    The CONTRL is marked Accepted when it is sent, so it does not wait in the list of documents that need a reply.

FAQ

Questions? Answers.

What is an EDIFACT CONTRL message?
CONTRL is the syntax and service report of the UN/EDIFACT standard. It tells the sender of an interchange that the interchange arrived. It does the job of the X12 997 Functional Acknowledgement, with different segments and codes.
When does Fulfil send a CONTRL?
Fulfil creates a CONTRL after it has accepted an inbound document from an EDIFACT trading partner, which for an ORDERS means after the sales order is created. The trading partner needs an outbound CONTRL configured. Fulfil sends one CONTRL for each interchange, even when the interchange holds several orders.
What does the CONTRL from Fulfil say?
It repeats the control reference of the interchange it answers, with the sender and receiver IDs of that interchange, and the action code 8, which means the interchange was received. It reports on the interchange as a whole and does not list errors for a single message or segment.
Does a CONTRL mean the order is accepted?
No. The CONTRL says that the interchange arrived. Your answer to the order is the ORDRSP, which Fulfil sends when you process the sales order.
Does Fulfil read a CONTRL that the retailer sends?
Not today. Fulfil reads one inbound EDIFACT message, the ORDERS, and sends the CONTRL. An ORDRSP, DESADV or INVOIC that Fulfil has sent shows Waiting for acceptance after the transmission.
Which version of CONTRL does Fulfil send?
Fulfil encodes CONTRL as version D, release 3, with the EANCOM association code EAN004. It goes in its own interchange with UNOC syntax, version 3, over Fulfil's VAN connection. The CONTRL is marked Accepted as soon as it is sent, because a trading partner does not acknowledge an acknowledgement.

Acknowledge EDIFACT orders without anyone sending a reply by hand.